Home / Case Studies

Hydrocarbon Chiller

CASE STUDY: PN.3383.01.22 | Provide Detailed Design and Consulting Services for Facility Electrification

ASED Consulting Engineers International was engaged to provide engineering and design specification services for a brownfield pharmaceutical facility located in Brisbane, Australia. The client advised that they required specialist advice for electrifying parts of their manufacturing facility. Mainly transitioning from gas fired boilers to energy efficient heat pump systems.

ice cold

CASE STUDY: 3364 | Integrated Centralised Ammonia Refrigeration, Process Cooling & Heat Pump Systems

Multinational Cold Storage Specialist Engages ASED Consulting International for The Design & Implementation of an Integrated…

cold storage

CASE STUDY: 3370 | Refrigeration & Integrated Air-Conditioning System

International Cold Storage Specialist Engages ASED Consulting International for The Design & Specification of Refrigeration &…

translucent ice

CASE STUDY: 3390 | Refrigeration & Associated Heat Pump Equipment

Cold Storage Specialist Engages ASED Consulting International for The Design & Specification of Refrigeration & Associated Heat…

Scroll to Top